Decision Framework

What a project team should evaluate

01

Power gap

Required facility MW minus dependable capacity available when the project needs it.

02

Time gap

Target operational date compared with credible utility energization.

03

Water gap

Required water profile compared with dependable, acceptable supply.

04

Resiliency gap

Required availability compared with the failure modes and dependencies of existing infrastructure.

05

GTG assessment

Bring the site, load, water demand, utility status and target date. GTG frames the gaps before recommending a technology path.

Bring GTG the site, load and target date.

We use MW requirement, water demand, utility status, resiliency requirements and project schedule to frame a project-specific infrastructure conversation.