A position paper explains what we believe. A business case explains why it pays. A pledge is something a developer signs. The Good Citizenship Pledge turns GTG's standard into a one-page public promise a data center makes to the community that hosts it.
The pledge: Our data center will pay its own way, make its own power and water, stay quiet, and report openly to the community that hosts it.
The six commitments — and what gets reported
Every commitment is paired with something the public can check. That pairing is the point: a promise without a report is just marketing.
| We commit to | What we report publicly |
|---|---|
| 1. Pay our own way. We fund 100% of our power and water infrastructure. No costs fall on ratepayers, residents or local businesses. | Cost-allocation statement filed with the utility and regulator |
| 2. Bring our own power. Our primary power comes from a micro-grid we own and operate. The grid is backup or export only. | Monthly grid draw, including at peak demand |
| 3. Keep the air clean. No diesel for prime power. We use heat and emissions recovery and move our fuel toward green hydrogen or ammonia. | Quarterly emissions monitoring results |
| 4. Be a quiet neighbor. No audible impact at our property line, using underground equipment vaults, baffling and setbacks. | Pre-build noise study; regular property-line readings against our published dB limit |
| 5. Make our own water. We draw no water from local aquifers or municipal supply for cooling and operations. | Quarterly gallons produced, recovered and drawn (target: zero drawn) |
| 6. Open our books and share benefits. We sign no nondisclosure agreements with local officials and sign an enforceable community benefits agreement. | Public dashboard; signed agreement; annual community meeting |
Before we break ground
A signatory completes five steps before construction starts, so the community sees the plan before it sees the bulldozers:
- Publish the site's power load, water demand and fuel plan.
- Complete a cumulative environmental impact assessment.
- Complete a noise study and publish the property-line limit.
- Sign a community benefits agreement with enforcement terms.
- Name a community liaison and a public reporting schedule.
Why sign it
Zoning hearings are increasingly decided on four questions: Will my bill go up? Will my well run dry? Will I hear it? Will anyone tell us the truth? The pledge answers all four in writing, before the hearing starts. It also lines up with the provisions of the Illinois POWER Act, so a signed project is already built to the rules lawmakers are weighing.
The commitments aren't aspirational for GTG projects. PTE turbofans supply the operator-owned micro-grid and can sit in underground vaults; GTG atmospheric water generators and the Water Vapor Recovery System supply the water; and the metering behind both feeds the public dashboard.
How to sign
Download the pledge, complete the signature block (company, project and location, authorized signatory, title and date), and send it to amo@GreenTechnologyGlobal.com. Want the reasoning and the numbers first? Read GTG's position paper and the business case.